Home – RAPA Phase Ⅰ Production Project
The RAPA Phase I Production Project involves the construction of a modern production workshop with a total floor area of 12,311.18 sqm.
The facility features a reinforced concrete frame structure combined with a steel roof and enclosure system, alongside a three-storey office area totaling 3,425.46 sqm, supported by complete auxiliary facilities and infrastructure.
RAPA Electromagnetic Technology (Jiangsu) Co., Ltd.
May 30, 2024
Jintan Economic Development Zone, Changzhou, Jiangsu, China
RMB 64,000,000
The RAPA Phase I Production Project was developed to support the expansion of advanced electromagnetic valve manufacturing capacity.
The project includes a large-scale production workshop, office facilities, and supporting infrastructure designed to meet modern industrial standards and operational requirements.
The project was successfully completed in accordance with the approved design and quality standards, meeting the client’s operational and functional requirements.
The completed facility now supports efficient production operations and provides a solid foundation for future expansion.